Sec. 10.15.09.17. Milk Facility Construction and Plan Submission  


Latest version.
  • Pursuant to the standards set forth in the Grade “A” Pasteurized Milk Ordinance, Section 12 for construction, reconstruction, or extensive alteration of a milk facility, a person shall submit to the Department:

    A. A plan and specifications before:

    (1) Constructing, reconstructing, or extensively altering a milk facility;

    (2) Converting or remodeling an existing building or structure for use as a milk facility;

    (3) Adding, replacing, relocating, or modifying a milk facility process; or

    (4) Adding, modifying, or replacing a clean-in-place (CIP) or other washing system or any part of a clean-in-place or other washing system;

    B. Plans and drawings bearing the name of a professional engineer or a representative of the company performing the work;

    C. Contact information for the facility, including:

    (1) The full name, title, and telephone number of each applicant;

    (2) The name of the plant;

    (3) The mailing address;

    (4) The location; and

    (5) Directions to the site;

    D. A narrative describing the scope and purpose of the project, including a projected timeline from start to completion;

    E. An estimate of finished product output per day;

    F. Sample product labels for each product;

    G. A list of:

    (1) All products to be produced;

    (2) Raw cream and nonfat, condensed, or any other milk or milk products to be sold; and

    (3) Single service container sources;

    H. A scale drawing showing the layout and arrangement of areas within and around the milk facility, including areas for:

    (1) Processing;

    (2) Chemical storage;

    (3) Dry storage;

    (4) Ingredient and product storage;

    (5) Receiving;

    (6) Load out;

    (7) Laboratories;

    (8) Offices;

    (9) Restroom facilities;

    (10) Lockers or a facility for the storage of personal items; and

    (11) Employees to eat and drink beverages;

    I. A scale drawing showing the location of all equipment, including:

    (1) Pasteurizers and sterile systems;

    (2) Milk processing equipment;

    (3) Fillers;

    (4) Raw and pasteurized tanks and silos;

    (5) Clean-in-place (CIP) systems;

    (6) Glycol water tanks;

    (7) Recirculating cooling water tanks;

    (8) Boilers;

    (9) Boiler makeup tanks;

    (10) Culinary steam systems; and

    (11) Blow mold systems;

    J. A scale drawing showing the location of plumbing and plumbing fixtures, including:

    (1) Water lines;

    (2) Sewer lines;

    (3) Hand sinks;

    (4) Toilets;

    (5) Utility sinks;

    (6) Utensil washing sinks;

    (7) Floor drains;

    (8) Floor sinks;

    (9) Hose stations; and

    (10) All backflow prevention devices;

    K. A legend for each drawing;

    L. Specifications for:

    (1) Ventilation including, but not limited to, the type and location of:

    (a) An air filter;

    (b) An air pump; and

    (c) A compressor;

    (2) Construction materials for the building and interior finishes; and

    (3) Pasteurizer plate coolers, if separate from the pasteurization system;

    M. A list and description of all boiler, glycol, and recirculating water additives and water treatment;

    N. A description of the:

    (1) Type of disposal for wastewater and sewage;

    (2) Source and system for the facility’s potable water supply;

    (3) Lighting fixtures and placement; and

    (4) Recirculating cooling system;

    O. Specification sheets, including manufacturer and model number of all milk facility equipment;

    P. A document that lists the flow for all products through the plant, grouped in categories, identifying each functional piece of equipment and each process used in processing and packaging, including:

    (1) Reclamation systems;

    (2) Standardization procedures or formulation procedures, or both;

    (3) Vitamin addition protocol; and

    (4) Draining of product lines;

    Q. Plans, specifications, drawings, and flow diagrams for each high temperature short time (HTST) and higher heat short time (HHST) system, showing each functional component;

    R. Clean-in-place (CIP) flow diagrams from the makeup tanks through all equipment;

    S. If applicable, information and drawings on how separation from product lines will be accomplished;

    T. Written step-by-step standard operating procedures (SOPs and SSOPs) for the following, if not included in §W of this regulation:

    (1) Receiving, processing, storing, and packaging of each product;

    (2) Drug residue testing;

    (3) Cleaning and sanitization for all equipment;

    (4) Cleaning and sanitization for the facility; and

    (5) Product trace back, inclusive of production/make sheet;

    U. A pest control program;

    V. Employee training and personal hygiene practices; and

    W. A food safety plan that complies with 21 CFR Part 117 and at a minimum includes:

    (1) A written hazard analysis;

    (2) Written preventive controls that address:

    (a) Process preventive controls;

    (b) Food allergens;

    (c) Sanitation;

    (d) Supply-chain controls;

    (e) A product recall plan; and

    (f) Other hazards identified in the hazard analysis as requiring a preventive control;

    (3) Written procedures for monitoring the implementation of the preventive controls as appropriate to the nature of the preventative control and its role in the facility’s food safety system;

    (4) Written corrective action procedures as appropriate to the nature of the hazard and the nature of the preventive control; and

    (5) Written verification procedures as appropriate to the nature of the preventative control and its role in the facility’s food safety system.