Code of Maryland Regulations (Last Updated: April 6, 2021) |
Title 26. Department of Environment |
Part 3. |
Subtitle 17. WATER MANAGEMENT |
Chapter 26.17.04. Construction on Nontidal Waters and Floodplains |
Sec. 26.17.04.09. Conduits, Pipes, or Other Devices Pertaining to the Potomac River
Latest version.
-
The construction, reconstruction, alteration, or addition to any conduit, pipeline, wire cable, trestle, or other device, structure, or apparatus, in, under, through, or over the bed or waters of the Potomac River requires a waterway construction permit from the Administration. Any waterway construction permit issued for this construction shall be subject to the requirements of Regulation .08C of this chapter and permit charges as may be assessed by the Board of Public Works.