Sec. 26.13.06.10. Closure — Disposal or Decontamination of Equipment, Structures, and Soils  


Latest version.
  • A. During the partial and final closure periods, the owner or operator shall properly dispose of or decontaminate all contaminated equipment, structures, and soil unless specified otherwise in Regulations .18D, .19B(4), .20B(6), or .22B(3) of this chapter, or in 40 CFR §265.280, which is incorporated by reference in Regulation .21A of this chapter.

    B. By removing all hazardous wastes or hazardous constituents during partial and final closure, the owner or operator may become a generator of hazardous waste and shall handle that hazardous waste in accordance with all applicable requirements of COMAR 26.13.03.