Sec. 26.11.24.03-1. Decommissioning of the Stage II Vapor Recovery System  


Latest version.
  • A. Notwithstanding Regulation .03A of this chapter, an owner or operator of a gasoline dispensing facility or system of gasoline dispensing facilities that installed approved Stage II vapor recovery systems:

    (1) May decommission Stage II vapor recovery systems in accordance with §B of this regulation after October 1, 2016; or

    (2) May decommission Stage II vapor recovery systems in accordance with §B of this regulation where a gasoline dispensing facility undergoes a major modification after the effective date of this regulation.

    B. An owner or operator of a gasoline dispensing facility that decommissions a Stage II vapor recovery system shall perform the decommissioning of the Stage II vapor recovery system in accordance with the “Recommended Practices for Installation and Testing of Vapor Recovery Systems at Vehicle Refueling Sites” of the Petroleum Equipment Institute, Section 14, 2009 and COMAR 26.10.10.