Sec. 26.11.10.07. Testing and Observation Procedures  


Latest version.
  • For the purpose of demonstrating compliance with these regulations, the Department's Technical Memorandum 91-01, "Test Methods and Equipment Specifications for Stationary Sources" (January 1991), which is incorporated by reference in COMAR 26.11.01.04C, shall be used. Installations causing intermittent or noncontinuous emissions shall be stack tested by a procedure which provides for sampling only during the discharge of emissions.