Sec. 26.10.02.05. General Operations Permit  


Latest version.
  • All underground storage systems regulated under this subtitle are permitted if the following conditions are met:

    A. All applicable requirements of COMAR 26.10.02-26.10.11 are met;

    B. Components and appurtenances connected to an UST system that are not operational are removed or properly decommissioned to:

    (1) Ensure proper operation of all spill and overfill, corrosion protection, and release detection equipment of the UST system; and

    (2) Prevent a release;

    C. The facility where the UST system is located is made available for inspection by the Department;

    D. All records relative to these regulations and the Environment Article pertaining to the facility or operation of the facility are available for inspection by the Department; and

    E. Any surveys or other documents required by the Department are completed in a timely manner.