Sec. 26.10.02.03-2. New Gasoline UST System  


Latest version.
  • The owner of a new gasoline UST system in a high-risk groundwater use area shall:

    A. Install all piping, including Stage II vapor recovery piping, in accordance with COMAR 26.10.03.02;

    B. Install and utilize, on the piping, an interstitial release detector system approved by the National Work Group on Leak Detection Evaluations;

    C. For USTs with a capacity of greater than 2,000 gallons or for multiple tanks in a shared tank excavation:

    (1) Install four monitoring pipes in accordance with the specifications in COMAR 26.10.03.04B, so that one monitoring pipe is located in each corner of the tank excavation area; and

    (2) In conjunction with the monitoring pipes, install a piping system that is designed to allow for active ventilation of the tank excavation area;

    D. Before placing the UST system in service, test the system for leaks using a helium pressure test, or other test approved by the Department, in accordance with procedures prescribed by the Department;

    E. Implement one of the following:

    (1) Install a minimum of three groundwater monitoring wells outside the UST excavation area in locations that will determine groundwater flow and detect a release from the UST system in accordance with COMAR 26.04.04 and Department specifications;

    (2) Install a pressure control system that:

    (a) Is approved by the Department;

    (b) Is continuously operated;

    (c) Continuously monitors tank pressures;

    (d) Maintains tank pressure at an average negative pressure; and

    (e) Prevents the release of gasoline vapors to the environment.

    (3) Install a soil vapor extraction system in conjunction with the monitoring pipes that will allow for continuous active ventilation of the tank excavation area; or

    (4) Obtain Department approval for an alternative method that will prevent and detect the release of gasoline liquid and vapors from the UST system;

    F. In addition to requirements for release detection in COMAR 26.10.05:

    (1) Test all spill catchment basins and containment sumps in accordance with COMAR 26.10.03.03;

    (2) Within 30 days of the new gasoline UST system installation:

    (a) Sample each site supply well and monitoring well using a method approved by the Department; and

    (b) Test each sample obtained in §F(2)(a) of this regulation in accordance with Regulation .03-3 of this chapter;

    (3) Annually thereafter sample and test as required in §F(2)(a)-(b) of this regulation; and

    (4) Test the UST system after any repairs are completed in accordance with Regulation .03-4A(2) of this chapter.