Sec. 26.03.10.03. Project Eligibility  


Latest version.
  • A. Project costs which are eligible for financial assistance under this chapter may include:

    (1) The acquisition of new facilities;

    (2) The construction of new facilities;

    (3) Additions to, or modifications of, existing facilities;

    (4) Equipment purchases; and

    (5) Lands, easements, and rights-of-way.

    B. Project costs which may not be funded, except as provided for in §C, of this regulation, include:

    (1) Feasibility studies;

    (2) Planning;

    (3) Administrative costs and overhead; or

    (4) Plans and specifications.

    C. Project costs outlined in §B, of this regulation, may be funded if the:

    (1) Secretary determines that the applicant does not have the financial capability to produce the necessary feasibility studies, plans, and specifications; and

    (2) Applicant is requesting financial assistance in the form of a loan or a loan guarantee.

    D. The award of a loan or loan guarantee does not eliminate the requirement that the applicant obtain all required permits for a solid waste processing or disposal facility. The applicant shall remain liable for repayment of all applicable loans regardless of whether a permit is issued or the facility becomes operational.

    E. Allowances. The additional costs permitted in §C, of this regulation, may not exceed the percent of the total project cost as interpolated from Tables 1 and 2. State participation for these costs shall require a bona fide commitment from the applicant that construction of the proposed project will begin within 2 years.

    Table 1. Allowance for Feasibility Studies, Planning, Administrative Costs and Overhead, and Plans and Specifications
    Project Allowance as a Percentage
    of Building Cost
    $100,000 12.971
    120,000 12.688
    150,000 12.350
    175,000 12.122
    200,000 11.928
    250,000 11.610
    300,000 11.357
    350,000 11.147
    400,000 10.968
    500,000 10.676
    600,000 10.443
    700,000 10.250
    800,000 10.088
    900,000 9.943
    1,000,000 9.817
    1,200,000 9.603
    1,500,000 9.347
    1,750,000 9.174
    2,000,000 9.027
    2,500,000 8.787
    3,000,000 8.595
    3,500,000 8.438
    4,000,000 8.301
    5,000,000 8.080
    6,000,000 7.903
    7,000,000 7.757
    Table 2. Allowance for Plans and Specifications Only
    Project Allowance as a Percentage
    of Building Cost
    $100,000 12.971
    $100,000 7.253
    120,000 7.168
    150,000 7.068
    175,000 6.997
    200,000 6.937
    250,000 6.839
    300,000 6.759
    400,000 6.635
    500,000 6.541
    600,000 6.465
    700,000 6.401
    800,000 6.347
    900,000 6.299
    1,000,000 6.257
    1,200,000 6.184
    1,500,000 6.096
    1,750,000 6.038
    2,000,000 5.984
    2,500,000 5.899
    3,000,000 5.831
    3,500,000 5.773
    4,000,000 5.724
    5,000,000 5.643
    6,000,000 5.577
    7,000,000 5.522
    8,000,000 5.475
    9,000,000 5.434
    10,000,000 5.397