Code of Maryland Regulations (Last Updated: April 6, 2021) |
Title 26. Department of Environment |
Part 1. |
Subtitle 03. WATER SUPPLY, SEWERAGE, SOLID WASTE, AND POLLUTION CONTROL PLANNING AND FUNDING |
Chapter 26.03.10. Financial Assistance for the Construction of Solid Waste Processing and Disposal Facilities |
Sec. 26.03.10.03. Project Eligibility
-
A. Project costs which are eligible for financial assistance under this chapter may include:
(1) The acquisition of new facilities;
(2) The construction of new facilities;
(3) Additions to, or modifications of, existing facilities;
(4) Equipment purchases; and
(5) Lands, easements, and rights-of-way.
B. Project costs which may not be funded, except as provided for in §C, of this regulation, include:
(1) Feasibility studies;
(2) Planning;
(3) Administrative costs and overhead; or
(4) Plans and specifications.
C. Project costs outlined in §B, of this regulation, may be funded if the:
(1) Secretary determines that the applicant does not have the financial capability to produce the necessary feasibility studies, plans, and specifications; and
(2) Applicant is requesting financial assistance in the form of a loan or a loan guarantee.
D. The award of a loan or loan guarantee does not eliminate the requirement that the applicant obtain all required permits for a solid waste processing or disposal facility. The applicant shall remain liable for repayment of all applicable loans regardless of whether a permit is issued or the facility becomes operational.
E. Allowances. The additional costs permitted in §C, of this regulation, may not exceed the percent of the total project cost as interpolated from Tables 1 and 2. State participation for these costs shall require a bona fide commitment from the applicant that construction of the proposed project will begin within 2 years.
Table 1. Allowance for Feasibility Studies, Planning, Administrative Costs and Overhead, and Plans and Specifications Project Allowance as a Percentage
of Building Cost$100,000 12.971 120,000 12.688 150,000 12.350 175,000 12.122 200,000 11.928 250,000 11.610 300,000 11.357 350,000 11.147 400,000 10.968 500,000 10.676 600,000 10.443 700,000 10.250 800,000 10.088 900,000 9.943 1,000,000 9.817 1,200,000 9.603 1,500,000 9.347 1,750,000 9.174 2,000,000 9.027 2,500,000 8.787 3,000,000 8.595 3,500,000 8.438 4,000,000 8.301 5,000,000 8.080 6,000,000 7.903 7,000,000 7.757 Table 2. Allowance for Plans and Specifications Only Project Allowance as a Percentage
of Building Cost$100,000 12.971 $100,000 7.253 120,000 7.168 150,000 7.068 175,000 6.997 200,000 6.937 250,000 6.839 300,000 6.759 400,000 6.635 500,000 6.541 600,000 6.465 700,000 6.401 800,000 6.347 900,000 6.299 1,000,000 6.257 1,200,000 6.184 1,500,000 6.096 1,750,000 6.038 2,000,000 5.984 2,500,000 5.899 3,000,000 5.831 3,500,000 5.773 4,000,000 5.724 5,000,000 5.643 6,000,000 5.577 7,000,000 5.522 8,000,000 5.475 9,000,000 5.434 10,000,000 5.397