Sec. 26.03.06.05. Selection Criteria and Priority System Establishment  


Latest version.
  • A. The Department shall establish and maintain a stormwater pollution control project priority list.

    B. The selection criteria for grant awards shall provide the basis for developing the project priority list. These criteria shall include:

    (1) The local water quality impacts caused by existing stormwater runoff conditions;

    (2) Previous efforts expended to correct any existing stormwater problem;

    (3) The level of pollution control provided by a proposed project;

    (4) Over-all project cost;

    (5) The applicant's ability and commitment to:

    (a) Inspect and review construction performance,

    (b) Provide the 25 percent match through funds or in-kind services and fulfill all grant conditions,

    (c) Assure accountability for all funds awarded;

    (6) Innovative or alternative nature of the project;

    (7) Public visibility of the completed project.