Sec. 26.03.01.06. Flow Data  


Latest version.
  • For each service area, flow data for all community and multi-use sewerage facilities will be presented according to either Table No. 15 for wastewater treatment plants or Table No. 15A for all principal collector sewers, interceptors, pumping stations, and associated force mains. Information presented previously in either Table No. 9 or Table No. 10 can be omitted from Table No. 15. In Table No. 15A, present data according to the flow pattern of existing sewerage system by starting with principal collector sewers and proceed to the treatment plant.

    Table No. 3
    Projected Water Supply Demands and Planned Capacity
    Service Area Present 1975 1980 1990 2000
    Population GPCD Capacity Population GPCD Capacity Population GPCD Capacity Population GPCD Capacity
    total served unserved (gals) demand planned total served unserved (gals) demand planned total served unserved (gals) demand planned total served unserved (gals) demand planned
    ------
    Table No. 4
    Inventory of Existing Community System Wells
    Well Name
    or Number
    Aquifer Coordinate
    Location
    Depth
    Feet
    Diameter
    Inches
    Max. Safe
    Yield
    Pumping
    Capacity
    Water
    Quality
    Municipal (Public)
    Industrial
    Private Community/Institutional
    ------
    Table No. 5
    Inventory of Existing Impounded Supplies
    Owner Crest
    Elevation
    (above sea level)
    Spillway
    Length
    Total Length of Dam Height of Crest Above Stream Bed Flooded Area of Crest Elevation Length of Shore Line at Crest Elevation Water Overflowed Crest for First Time Capacity of Reservoir Safe Yield (MGD) Average Daily Withdrawal (MGD)
    Municipal (Public)
    Industrial
    Private Community/Institutional
    ------

    Table No. 6
    Inventory of Existing Water Treatment Facilities

    Owner Water Source Type Treatment Plant Coordinate Location Rated Plant Capacity (MGD) Average Production (MGD) Max Peak Flow
    (MGD)
    Storage
    Capacity
    (MGD)
    Planned Expansion MGD/Dates Method of Sludge Disposal Operating Agency
    Municipal (Public)
    Industrial
    Private Community*/Institutional

    * If transfer to public ownership is recommended, indicate expected date.

    ------
    Table No. 8
    Immediate, 5 and 10 Year Priorities for Water Development
    Estimated Costs* Project Status
    Constr. Start
    Fiscal Year
    and
    Project Number
    County
    Priority
    Assigned
    Coordinate
    Location
    Description Total Federal
    and/or
    State
    Local Immediate
    Priority
    Projects
    5 and 10 Year
    Period Projects
    ______Year

    * Based on dollar values as of effective date of plan where applicable.

    ------
    Table No. 9
    Projected Sewerage Demands and Planned Capacity
    Service Area Present 1975 1980 1990 2000
    Population GPCD Capacity Population GPCD Capacity Population GPCD Capacity Population GPCD Capacity
    total served unserved (gals) demand planned total served unserved (gals) demand planned total served unserved (gals) demand planned total served unserved (gals) demand planned
    ------
    Table No. 10
    Inventory of Existing Water Treatment Facilities
    Owner Type Treatment Plant Coordinate Location Occupied Acres Vacant Acres Point of Discharge* Max Site Capacity
    Secondary
    Max. Site Capacity (MGD) Advanced Existing (MGD) Capacity Flows (MGD)
    Average Peak
    Planned or Expected Abandonment Date of Interim MGD Date Operating Agency
    Municipal
    (Public)
    Industrial
    Private Community**/
    Institutional

    ** If transfer to public ownership is recommended, indicate expected date.

    ------
    Table No. 11
    Problem Areas Inventory - Individual and Community
    Service Area Problem
    Description
    Location Population Acres Treatment Capacity Treatment Demand Planned
    Correction
    Date if Known
    ------
    Table No. 12
    Water Quality Problem Due to Storm Drainage Outfalls and to Non-point Sources
    Service Area Problem Description Location Reach Affected
    ------
    Table No. 13
    Immediate 5 and 10 Year Priorities for Sewerage Development
    Costs** Projected Schedule***
    Fiscal Year and Project Number County Priority
    Assigned
    Coordinate* Location Description Total PL 660 Eligibility Other Federal Local Preliminary Plans Financial Plans Start Construction Complete Construction
    _____Year
    _____Year

    * Where applicable for both treatment facility and point of discharge location.

    ** Based on real dollar values.

    *** Month and year-for the last 5 years the "Construction Schedule Column" and need not be filled in.

    Table No. 14 Water and Sewerage Map Symbols

    ------
    Table No. 15
    Flow Data
    Wastewater Treatment Plants
    Design Parameters Flow Development Occupancy Units (1)
    Name or
    Service Area
    Hydraulic
    (mgd)
    Organic
    (ppm)
    Avg. Day*
    (mgd)
    Max. Day
    & (Date**)
    Existing* Anticipated***
    BPI
    PWA
    BOD SS UC NUC
    Example: 117 R 7 R 830 R
    Clear Water

    3.5

    200 200

    3.0

    5.5(3-17-76) 6,500 7 C none none

    * Per Effective Date of Plan (7-1-76)

    ** During Previous Fiscal Year

    *** List Residential (R) Separately from Commercial (C) and Industrial (I)

    BPI-Building Permits Issued Per Effective Date of Plan

    UC-Building Permits Issued Per Effective Date of Plan for Units under Construction

    NUC-Building Permits Issued Per Effective Date of Plan for Units not under Construction

    PWA-Building Permits for Unexpired Public Works Agreements Per Effective Date of Plan

    (1) -Includes Industrial, Commercial and Residential Units

    ------
    Table No. 15A
    Flow Data
    Collector Sewers, Inceptors, Pumping Stations and Force Mains
    Name or Sewer Type Designation Sewer Capability
    Pumping Station
    Force Main
    Diam.
    (Inches)
    Flow,
    Avg.
    Day*
    mgd
    Design
    Number of Pumps Capacity of Each Pump
    (mgd)
    Normal Pumping
    Capacity (mgd)
    Avg. Day Pumpage* (mgd) Max. Day
    Pumpage
    and Mgd
    (date)**
    Diam. (inches) Design FLow (mgd)
    Example:
    Collector
    12 0.5 1.0
    Clear Branch Interceptor 18 3.5 5.0
    Severn Run
    P.S. and
    2 3.6 3.6 2.5 3.0
    (3-1-76)
    F.M. 24 8.0
    Clear Water
    STP
    (See Table No. 15)

    * Per Effective Date of Plan (7-1-76)

    ** During Previous Fiscal Year