Sec. 20.85.01.06. Requirements to be Furnished by Applicant
Latest version.
-
The applicant shall furnish or pay for, or both, as elected by the utility:
A. Rights-of-way and easements in accordance with Regulation .03 of this chapter;
B. Required suitable conduit systems, including conduits or raceways within a building on the line side of the meter;
C. Required suitable transformer vaults and entrance facilities;
D. Required suitable enclosures for switching and protective equipment; and
E. All equipment and facilities, other than those specified above, required by the utility's rate schedule for the type of service received.