Code of Maryland Regulations (Last Updated: April 6, 2021) |
Title 14. Independent Agencies |
Subtitle 39. INTERAGENCY COMMISSION ON SCHOOL CONSTRUCTION |
Chapter 14.39.02. Administration of the Public School Construction Program |
Sec. 14.39.02.11. Ineligible Expenditures
-
The following expenditures are ineligible for State funding:
A. Site acquisition;
B. Offsite development costs except those listed as eligible in Regulation .10 of this chapter;
C. Architecture, engineering, or other consultant fees;
D. Master plans, feasibility studies, programs, educational specifications, or equipment specifications;
E. Projects proposed in buildings or portions of buildings that have been constructed or renovated within 15 years, except that a building or portion of a building in which a limited renovation was performed is eligible for additional work within 15 years of the date that the limited renovation construction was completed;
F. Systemic renovation projects to replace, upgrade, or renovate building systems that have been replaced, upgraded, or renovated within 15 years.
G. Ancillary construction costs such as:
(1) Permits;
(2) Test borings;
(3) Soil analysis;
(4) Bid advertising;
(5) Water and sewer connection charges;
(6) Topographical surveys;
(7) Models;
(8) Renderings; or
(9) Cost estimating;
H. Leasing or purchasing school facilities except as provided in COMAR 14.39.05;
I. Construction inspection services;
J. Relocation costs for site occupants;
K. Salaries of local employees;
L. Construction of administrative or support facilities, including regional or central administrative offices, warehousing, resource, printing, vehicle storage, and maintenance facilities;
M. Movable equipment, furnishings, and artwork as defined by the IAC;
N. Maintenance; and
O. Temporary storage.