Sec. 08.08.07.05. Failure to Comply  


Latest version.
  • If the lake manager orders removal of the structure, facility, safety hazard, dock, or mooring buoy and the permittee fails to comply within the time allowed, then the bond in COMAR 08.08.05.05A(4), if required, shall be forfeited and the proceeds applied to:

    A. Removal;

    B. Damages to the lake or buffer strip, or both; and

    C. Storage.