Sec. 05.04.15.10. Work Requirements  


Latest version.
  • A. Contractors and their subcontractors shall meet the requirements of COMAR 05.04.01.13.

    B. Work done, materials supplied, and construction procedures employed shall comply with all contract documents, applicable codes and standards, including those set forth in these regulations, and those general specifications established by the Department.

    C. Permits. If required by State codes or local codes, all building permits shall be obtained and posted at the project before the beginning of construction.

    D. Compliance with applicable codes and obtaining required permits and licenses are the responsibility of the grantee and contractor.

    E. Any action taken by the Department or the local administrator to prepare or review work write-ups, evaluate the property, or review and approve plans and specifications is:

    (1) To assure the Department and the local administrator of the adequacy of the proposed work; and

    (2) Not intended to substitute for or ensure compliance with appropriate State and local building codes.